Latest Travel Information

Home / Latest Travel Information

Arrivals & Departures

Find out about the times and statuses of our flights. Simply select a departure and arrival airport or enter a flight number and select 'Go'.

Flight route

Show list

Flight number

Choose departure
Choose destination

Latest Travel Information

Latest Flight Status

Last Updated: Wednesday 15th August 2018 10:00 BST

To see the status of your flight, please enter your flight number or route in the boxes above.

To see the status of your flight, please enter your flight number or route in the boxes above.

Manchester Airport – Jet2.com Arrivals and Departures at Terminal 2 – Important Information

Last Updated: Wednesday 15th August 2018 10:00 BST

Please be aware that all Jet2.com flights for the following destinations will depart and arrive from Manchester Airport – Terminal 2:

  • Lanzarote...

Please be aware that all Jet2.com flights for the following destinations will depart and arrive from Manchester Airport – Terminal 2:

  • Lanzarote (Arrecife)
  • Malaga
  • Majorca (Palma)
  • Tenerife South

Our Twilight Check-in for these destinations will also take place at Terminal 2.

All other Jet2.com flights will continue to operate through Manchester – Terminal 1.

Read More

Leeds Bradford Airport - Roadworks to be carried out on A658 Pool Bank New Road from 08th May 2018 to the end September 2018

Last Updated: Wednesday 15th August 2018 10:00 BST

Jet2.com and Jet2holidays have been advised of a Roadworks project that will take place to carry out essential roadworks to repair a culvert under the A658 Pool Bank New Road in Leeds.

The work...

Jet2.com and Jet2holidays have been advised of a Roadworks project that will take place to carry out essential roadworks to repair a culvert under the A658 Pool Bank New Road in Leeds.

The work will be managed by Leeds City Council and will begin on Tuesday 8 May 2018, and will focus on a stretch of the A658 north-east of the Dyneley Arms junction between the A660 Leeds Road and Pool-in-Wharfedale.

 The project is expected to be completed in September, with the road remaining open to all users throughout but with a single lane restriction in place, a reduced 30-miles per hour speed limit and temporary traffic signals in operation. In order to minimise the length of the project, work is to be undertaken seven days a week when possible. Further information is available via this link:

https://news.leeds.gov.uk/culvert-repair-works-needing-to-be-extended-on-a658-pool-bank-new-road/

We advise all customers travelling to/from Leeds Bradford Airport in this direction to allow extra time to get to the airport as all Jet2.com check in desks will close in line with our scheduled departure times for all flights.

Read More